In Western Australia, dust control and monitoring on construction sites is regulated through local government approvals, the Environmental Protection Act 1986 and work health and safety law.

Regulators expect you to assess dust risk before work starts, keep airborne dust within the boundary, respond to complaints quickly and, on higher-risk sites, back it up with data.

Who regulates construction dust in WA?

Three regulators are involved, each looking at a different aspect of dust risk:

At a federal level, the National Environment Protection (Ambient Air Quality) Measure (NEPM) sets air quality standards that governments report against. It doesn’t apply directly to a construction site, but its values, such as 50 µg/m³ for PM10 averaged over 24 hours, are the criteria the dust guideline uses for monitoring at the site boundary.

What the WA dust guideline expects

The main reference for site managers is A guideline for managing the impacts of dust and associated contaminants from land development sites, contaminated sites remediation and other related activities (2011), published by DWER. It asks you to score the site on soil type, topography, disturbed area, type of work, distance to neighbours and wind exposure, which gives a risk class from 1 to 4.

Works between 1 October and 31 March move up a class where neighbours are within 100 metres. That window covers Perth’s dry season and strongest afternoon sea breezes. On Class 3 and 4 sites, boundary exceedances must be reported to the regulator within 24 hours, and on every classified site complaints must be logged, investigated and answered.

Dust suppression and control measures for WA conditions

Much of the Swan Coastal Plain is sand and those exposed grounds lift as soon as the wind picks up.

The most effect control measures here are:

What you need to monitor on a construction site

Hard data shows if your controls are working and gives you evidence should a neighbour or regulator question them. A typical program covers:

ParameterMethodWhat it tells you
Visible dustDaily inspections and a dust logWhether dust is leaving the site, and what was done about it
Wind speed and directionOn-site weather stationWhen to step up controls or stop work, and where dust is travelling
PM10 and PM2.5Real-time monitors at the boundaryShort-term concentrations against trigger levels and the guideline criteria
Dust depositionDust deposition gaugesLonger-term fallout on neighbouring properties, reported monthly
Worker exposurePersonal sampling for respirable dust and silicaCompliance with workplace exposure standards
ComplaintsComplaints registerWhat neighbours are noticing, and how quickly you responded

It’s important to set trigger levels before earthworks begin, each with a defined response, such as more water at the first trigger and stopping dusty activities at the second. Also look to collect background data first (the guideline suggests about four weeks for projects of up to six months) and aim for at least 90% data capture each month.

Common dust control mistakes

How we support dust control on WA construction sites

We design, install and run tailored dust monitoring programs for construction, civil and land development projects across Western Australia.

Our stations are built in-house and solar powered, and use beta attenuation monitors (BAMs), TEOMs and dust deposition gauges depending on the project. They send SMS and email alerts when trigger levels are reached, and you can view results through our remote data portal.

We can add weather stations, noise loggers and vibration loggers to the same system and our occupational hygienists handle worker exposure sampling for silica and respirable dust. We mobilise quickly across WA and provide reporting you can hand to your council, DWER or your client.